I have passed the IBM certifications I 000-974 exam recently,if you are worried about it,maybe I can share some experience with you.A colleague of mine, who have got the Microsoft Business Solutions, recommend Test4actual to me, saying that without the help of test4actual, he couldn’t have passed the exam.
Any doubts about the products quality left? Try the Test4actual IBM certifications I 000-974 exam free demo before buy!

1. Which of the following will allow a customer to display and monitor FC #7109 PDU+ energy usage data at various times of
the day via Ethernet connection to a PC?
A.Management Central
B.Display Power Management (DPM)
C.Systems Director Navigator for i5/OS
D.Systems Director Active Energy Manager
ANSWER: D
2. What color are the connectors for HSL-1, HSL-2 and 12X?
A.HSL-1: black, HSL-2: orange, 12X: green
B.HSL-1: yellow, HSL-2: black, 12X: green
C.HSL-1: yellow, HSL-2: orange, 12X: black
D.HSL-1: orange, HSL-2: black, 12X: yellow
ANSWER: B
3. A customer is migrating from a 270 to a one-core Power 520 with V5R4M5 and has the following requirements:
LTO-4 for backups on the new 520
LAN console
One internal modem
Which of the following features provides the correct configuration?
A.One FC #5736 Tape IOA and one FC #2893 2-line WAN IOA.
B.One FC #5746 internal tape and one FC #9793 2-line WAN IOA.
C.One FC #5775 Tape IOA and one FC #2893 IOPless 2-line WAN IOA.
D.One FC #5746 internal tape and one FC #2893 IOPless 2-line WAN IOA.

| English | Chinese(Traditional) | Chinese(Simplified) | Japan – 3 – Test4auctual Information Co., Ltd. All rights reserved.
ANSWER: D
4. A customer with a POWER5 525 has 6 drives in the CEC and wants to migrate to a new Power 520. Which of the following is
the easiest way to migrate this configuration?
A.Install all 6 drives from the 525 CEC into the Power 520 CEC.
B.Connect both systems to the same HMC. Use the Dedicated Service Tools (DST) Migrate While Active option.
C.Using the FC #5172 SAS conversion cable, migrate all the SCSI drives, as an intact RAID array, to the new machine.
D.Using an HMC and a FC #5095 expansion unit, move the drives from the 525 to the FC #5095 expansion unit. Then connect
the FC #5095 expansion unit to the Power 520 mark it as the load source location.
ANSWER: D
5. Historical performance data can be imported into the Workload Estimator tool from which of the following sources?
A.IBM Director
B.Performance menu
C.System i Navigator
D.PM for Power Systems
ANSWER: D

Download free Test4actual latest 000-974 demo.

most exam all in http://www.test4actual.com

http://test4actualcom.blog.com/wp-admin/

Are you worried about IBM WebSphere MQ V7.0 System Administration 000-374 exam?

Thursday, November 12th, 2009

Hi,guys.
Test4actual has updated the latest IBM WebSphere 000-374 exam,maybe it will help you pass your exams.
The newest practice for you:http://exam.test4actual.com/000-374.pdf

http://www.test4actual.com
http://www.test880.com
http://test4actualcom.blog.com

IBM Storage Sales Combined V1:000-200 exam

Wednesday, November 11th, 2009

Test4actual has cracked the latest dumps of 000-200 exam, which is the best study material for you to pass your exam.
Test4actual 000-200 exam dumps has cover 96% of real exam questions and answers.

1. Which of the following competitors offers customers a virtual tape solution for mainframes?
A.Sony
B.NetApp
C.Quantum
D.Sun Storage TekWArialCourier NewZX
ANSWER: D
2. Which of the following customer environments is addressed by the NSeries?
A.A customer wanting to implement a global file system
B.A customer with Windows CIFS and AIX NFS requirements
C.A customer who requires good scalability and performance
D.A customer who needs to consolidate multiple storage controllers under one management interface WArialCourier NewZX
ANSWER: B
3. A retail customer is experiencing bottlenecks in their IT environment.
Which of the following responses address this issue?
A.Meet with the IT Director
B.Present IBM’s On Demand storage strategy to CFO
C.Trial install of Tivoli Provisioning Manager (TPM)
D.Perform Disk Magic study WArialCourier NewZX
ANSWER: A
4. The Information Technology Director at a prospect is interested in purchasing the N3300, and has asked the storage specialist
to help present the solution to the Finance Director.
Which of the following should the storage specialist include in the proposal?
A.CIFS and NFS support is included in the price
B.A configuration showing the technical detail of the solution
C.N3300 combines iSCSI, NAS and FiberChannel into a single storage solution
D.Lowers Total Cost of Ownership (TCO) and improves Return On Investment (ROI)WArialCourier NewZX
ANSWER: D
5. A retail customer has a combination of Microsoft Windows file servers with direct attached storage and Power Systems with
AIX database servers SAN attached to a DS4700. The DS4700 is reaching capacity, and the customer needs to migrate to a more
scalable storage system.
Which of the following would be most appropriate to ask first?

| English | Chinese(Traditional) | Chinese(Simplified) | Japan – 3 – Test4auctual Information Co., Ltd. All rights reserved.
A.Will all servers be SAN attached?
B.What is the budget allocated for storage?
C.What is the projected storage requirement?
D.How much space is available in the current storage systems?WArialCourier NewZX
ANSWER: B

Try Test4actual 000-200 exam, 100% guarantee to pass your exam.

http://www.hp-exam.com
http://www.test4actual.org

the latest IBM 000-419 exam updates

Wednesday, November 11th, 2009

IBM certifications III “, also known as 000-419 exam, is a IBM certification.
Preparing for the 000-419 exam? Searching 000-419 Test Questions, 000-419 Practice Exam, 000-419 Dumps?

1. When running Word Investigation, producing a pattern report will help you do what?
A. Refine a standardization rule set.
B. Decide which fields to use for blocking fields.
C. Discover inconsistencies in data type representation.
D. Identify which patterns should survive.
Answer: A
2. In a sample data set of 10,000,000 records, the Social Security number has 90 percent distinct values. To ensure
that the Social Security number does not over-discriminate based upon its rare occurrence, which statement is true?
A. Change the u-probability on the match command screen from .01 to .0000001.
B. Set special variable handling “CRITICAL”.
C. Set special variable handling “NOFREQ”.
D. Do not use the Social Security number in a match command.
Answer: C

3. Which two steps occur when executing a match? (Choose two.)
A. summing records
B. isolating a subset of records to process using blocking strategy
C. incrementing a group of records using hashing strategy
D. scoring records
Answer: BD
4. You are obtaining product data from a new parts vendor. In your processing design you are using the Reference
Match stage to ensure these new parts are valid. This stage can deliver up to six outputs as a result of this match
processing. What are three of these outputs? (Choose three.)
A. Data Duplicate
B. Data Filtered
C. Clerical
D. Sorted
E. Match
Answer: ACE
5. What are the two Match Specification probabilities that can be configured? (Choose two.)
A. m probability
B. u probability
C. r probability
D. pi probability
Answer: AB

http://www.test4actual.com

6. What is a result when you increase the match cut-off setting?
A. It minimizes the false positives.
B. It minimizes the false negatives.
C. It adds agreement weight.
D. It subtracts agreement weight.
Answer: A
7. Some records in the Name column may contain a valid data value such as “Jane Doe” and some records contain
a NULL. The Name column is not used as a blocking variable. Which action can be performed in the match
specification to penalize records for containing a NULL in the name column?
A. Increase the Match Cut-off setting.
B. Change the Data Source Missing Weight.
C. Add a Weight Override for disagreement weight.
D. Change the Weight Override Conditional Data setting.
Answer: B
8. When testing a reference match specification, which two statements accurately describe what should be
performed? (Choose two.)
A. Match frequencies must be generated to have no overlap.
B. Match frequencies must be generated for the source file.
C. Match frequencies must be generated for the reference file.
D. Match frequencies must be generated to have some overlap.
Answer: BC
9. Given the survivorship rule shown below:
COLUMN3: (SIZEOF(TRIM c.COLUMN3) >= 5) AND (SIZEOF(TRIM c.COLUMN1) > 0)
How will this survivorship rule be interpreted?
A. COLUMN3 of the previous record should be retained if the column contains five or more characters and
COLUMN1 has any contents.
B. COLUMN3 of the previous record should not be retained if the column contains five or more characters and
COLUMN1 has any contents.
C. COLUMN3 of the current record should be retained if the column contains five or more characters and COLUMN1
has any contents.
D. COLUMN3 of the current record should not be retained if the column contains five or more characters and
COLUMN1 has any contents.
Answer: C
10. How does the Survive stage relate records to be survived?
A. by the target columns of each survive rule
B. by the group identification column
C. by the column to be analyzed for each rule
D. by the match type ID column
Answer: B

http://www.test4actual.com
http://www.oracle-exam.com
http://www.hp-exam.com

Exam : IBM 000-331

Wednesday, November 11th, 2009

Test4actual has updated the latest IBM 000-331 exam,maybe it will help you pass your exams.

1. Which of the following properly describes the 4-port Ethernet PCI adapter card used in IBM Power
Systems servers?
A. A single physical connection with four virtual MAC addresses
B. The four Ethernet connections on the card share a common PCI bus.
C. A single connection provides the virtual bandwidth of four Ethernet cards
D. Four separate LPARs can each use a port on the 4-port Ethernet PCI adapter card.
Answer: B
2. A customer with several older pSeries servers plans to consolidate to a single Power Systems server.
Which of the following tools can provide output that can be merged with Work Load Estimator to size the
upgrade based on utilization and growth trends?
A. Insight Manager
B. System Planning Tool
C. Tivoli Capacity Planner
D. Electronic Service Agent
Answer: B
3. A distribution company is running Oracle 9i and Solaris 8 on a Sun E10K. The prospect wants to upgrade
their technology and lower their TCO. Which of the following is the first thing the sales representative
should do to move them to a POWER6 solution?
A. Conduct an Oracle SAR.
B. Offer a proof of concept system
C. Engage the IBM Migration Factory team.
D. Determine if funding and skills are available.
Answer: D
4. A Power Systems sales representative has a meeting with the CIO of a telecommunications company.
They have twenty POWER4 systems now. They have ample budget for the new POWER6 systems. They
want to move very quickly into virtualization and are anxious to order additional servers. The customer must
be in production within 90 days. Which of the following is the key challenge for this opportunity?

A. Adequate funding
B. Business problem
C. Project management
D. Software requirements
Answer: C
5. A Power Systems sales representative has a meeting with the I/S Director of a large company with
twenty HP Superdomes systems. They plan to move their applications to IBM POWER6 servers and have
ample budget. Which of the following is key for the sales representative to identify?
A. Space requirements
B. Software requirements
C. POWER6 energy requirements
D. Project timing requirements
Answer: B

http://www.test4actual.com

http://www.hp-exam.com
http://www.test580.com

the latest IBM 000-330 exam updates

Wednesday, November 11th, 2009

IBM certifications III “, also known as 000-330 exam, is a IBM certification.
Preparing for the 000-330 exam? Searching 000-330 Test Questions, 000-330 Practice Exam, 000-330 Dumps?

1.
The customer has a 7014B42,
a 7014T00,
and a 7014T42,
each with available space. Which
rack/racks support(s) the installation of the BladeCenter H?
A.7014B42
B.7014T00
C.7014T42
D.7014B42,
and 7014T42
Correct:A
2.Which of the following supports a Linuxbased
HA solution?
A.SE Linux
B.GPFS for Linux
C.Cluster Systems Manager (CSM)
D.PowerHA Cluster Manager for AIX and Linux
Correct:D
3.How can a company that is concerned about energy costs in the datacenter use Power servers
to better manage energy usage?
A.Set energy management parameters with AEM
B.Set energy management parameters with IVM
C.Set energy management parameters within AIX
D.Set energy management parameters with the HMC
Correct:A
4.A customer is consolidating LAMP on Power. They would like to also consolidate Linux x86
OLTP applications. Which of the following should be discussed?
A.Requires PowerVM Lx86
B.Requires AIX 5.3 or later.
C.Native port is recommended
D.Enabled with the AIX Linux Toolkit
Correct:C
5.A large customer has many POWER4 servers that have been sized for their peak workload but
are under utilized most of the time. They are at the end of their lease and want to purchase
POWER6 servers. Which PowerVM technology will maximize their server utilization?
A.Workload Partitions
B.Partition Load Manager
C.Shared Processor Pools
D.Live Partition Mobility
Correct:C

http://www.test4actual.com

6.Which of the following is a competitive advantage of IBM PowerVM compared to HP Integrity
Virtual Machines (IVM)?
A.PowerVM provides the capability to support shared CPU, memory and I/O resources.
B.PowerVM Editions are supported on Power systems from low to highend
servers and blade servers.
C.AIX and Linux interface directly with the hardware and the hardware ensures isolation is maintained.
D.Processing resources can be dynamically allocated and shared between logical partitions with
PowerVM.
Correct:C
Test4actual Information Co., Ltd.All rights reserved.
3
7.
Which of the following does IBM Fix Central provide to customers?
A.Customer hotline for immediate dispatch of service personnel for critical issues.
B.Designated local service center for each customer location with a maintenance contract.
C.Subscription based onsite
service agreement for regularly scheduled system maintenance.
D.Web site access to PTFs and updates for system software, hardware, and operating systems.
Correct:D
8.A mid market customer wants to compare Power Systems performance to HP PARISC
performance from a complete systems perspective. Which performance metric should be used?
A.RPE2
B.SWAP
C.rPerf
D.SPECint 2006
Correct:A
9.How many network cards can be added to the JS12 and JS22 Blades?
A.JS12 = 1, JS22 = 1
B.JS12 = 2, JS22 = 2
C.JS12 = 1, JS22 = 2
D.JS12 = 2, JS22 = 1
Correct:B
10.Which of the following options for PowerHA Cluster Manager can help simplify implementation
and configuration in a DB2 and WebSphere environment?
A.Smart Assist
B.Insight Utility
C.Virtual Image Manager
D.Cluster Systems Management
Correct:A

http://www.test4actual.com
http://www.oracle-exam.com
http://test4actualcom.blog.com

Test4actual Latest 642-062 exam Dumps For Free

Monday, November 9th, 2009

All Cisco Certifications in Test4actual
Access Routing and LAN Switching
APE for Validating Knowledge
CCDA
CCDE
CCDP
CCIE
CCIP
CCNA
CCNP
CCSP
CCVP
Cisco Others Certification
Content Networking
IP Communications
Network Management
Optical
Sales Expert
Storage Networking
VPN and Security
WAASSE
Wireless LAN

most demo all in test4actual.com

Cisco Unified MeetingPlace Solutions (SMPS):646-276 exam

Monday, November 9th, 2009

Product Description
Exam Number/Code: 646-276
Exam Name: Selling Cisco Unified MeetingPlace Solutions (SMPS)
“”, also known as 646-276 exam, is a Cisco certification.
Preparing for the 646-276 exam? Searching 646-276 Test Questions, 646-276 Practice Exam, 646-276 Dumps?

With the complete collection of questions and answers, Test4actual has assembled to take you through 36 Q&A to your 646-276 exam preparation. In the 646-276 exam resources, you will cover every field and category in helping to ready you for your successful Cisco Certification.

Free 646-276 Demo Download
Test4actual offers free demo for 646-276 exam (Selling Cisco Unified MeetingPlace Solutions (SMPS)). You can check out the interface, question quality and usability of our practice exams before you decide to buy it. We are the only one site can offer demo for almost all products.

http://www.test4actual.com
http://www.hp-exam.com
http://www.oracle-exam.com

Exam : Symantec 250-308

Sunday, November 8th, 2009

Test4actual has updated the latest Symantec 250-308 exam,maybe it will help you pass your exams.

1. A network administrator wants to limit RPC traffic across the network and decides to completely restrict the use of DCOM and RPC for end users.
Which Enterprise Vault (EV) Client Extensions should be installed?
A. EV Vault Cache
B. EV HTTP Only Add-In
C. EV Archive Explorer
D. EV OWA Extensions
Answer: B

2. What are the three primary physical data-storage components of Mailbox Archiving in Enterprise Vault? (Select three.)
A. Indexes
B. Archives
C. Vault Store partitions
D. Enterprise Vault databases
E. Enterprise Vault Collector
Answer:ACD

3. What is the recommended minimum number of processors for Enterprise Vault servers?
A. 1
B. 2
C. 4
D. 8
Answer: B

4. What is the Vault Store configuration result after upgrading to Enterprise Vault 8.0?
A. All Vault Stores are fingerprinted for single instancing.
B. Each Vault Store is added to its own Vault Store Group.
C. All Vault Stores are added to a Default Vault Store Group.
D. Each Vault Store is configured for partition rollover.
Answer: C

5. Which mailbox does the Archiving Task use to connect to the Exchange Server?
A. any mailbox on the Exchange Server
B. the journal mailbox on the Exchange Server
C. the Exchange System mailbox
D. the Enterprise Vault System mailbox
Answer: D

http://www.test4actual.com/250-308.html

6. A user moves a shortcut created in Enterprise Vault (EV) from a Personal Expenses folder to a Business folder.The folders are associated with Personal Expenses and Business retention categories, respectively. The user notices that when the shortcut is moved, the retention category for the item remains as Personal Expenses.What should the administrator do to allow the item to inherit the retention period of the folder the item moves in to?
A. EV is working as designed. To change the retention, the user must restore and rearchive the item with the new retention category.
B. modify the options on the Moved Items tab of the Exchange Mailbox Policy to allow retention category updates
C. right-click the mailbox folders and select Update Retention
D. within Site Properties, select the Retention Categories tab and select Update Retention upon Move
Answer: B

7. Refer to the Exhibit.The picture Missing Based on the information included in the Archive Properties window shown in the exhibit, why should an administrator use the Rebuild Index Volume function?
A. A user’s permissions to this archive were recently changed and the administrator wants to update the index entries with these new permissions.
B. The index volume has failed, which prevents accessing the archived items.
C. A user that had previously delegated access to this archive no longer has this access and the index must be updated to reflect this change.
D. The archive’s indexing level has been changed from Brief to Medium and the user wants to take advantage of searching all archived items’ contents.
Answer: D

8. Refer to the Exhibit.The picture Missing If an organization uses a Mailbox Archiving Policy that uses the site schedule, how would the task run?
A. It would start every day at 6 p.m. and run until it is complete or until 6 p.m. the next day.
B. It would archive 1000 items for each mailbox each hour starting at 6 p.m. until complete or until 6 a.m. the next day.
C. It would start every day at 6 p.m. and run every hour until 6 a.m. the next day.
D. It would start every day at 6 p.m., synchronize all mailboxes, and then run until it is complete or until 6 a.m. the next day.
Answer: D

9. The administrator of ACME has been given a small number of PST files that have been exported from another Enterprise Vault (EV) system that needs to be accessible from the ACME EV system.What is the recommended method of migrating the PST files into EV?
A. Client-Driven PST Migration
B. Locate Migrate PST Migration
C. PST Migration Wizard
D. EVPM Scripted Migration
Answer: C

10. After an email is archived for 90 days, a company decides to remove shortcuts from users’ mailboxes. Archived email is retained for five years within the archive.Which three methods provide access to archived email when the shortcut is removed? (Select three.)
A. Search Vaults
B. Outlook search
C. Google desktop
D. Browser search
E. Archive Explorer
Answer:ADE

http://www.test4actual.com
http://www.test4actual.com/250-308.html
http://www.test580.com

the latest CompTIA JK0-016 exam updates

Sunday, November 8th, 2009

CompTIA JK0-016 exam has updated by Test4actual aimming at helping you pass your exams.

1: 单选题
Everyday around lunch time there is network latency on the Windows proxy server 10.1.1.7. Which of the following network utilities can a technician run in order to determine the severity of the latency?
A.arp -t 10.1.1.7
B.tracert -t 10.1.1.7
C.ping -t 10.1.1.7
D.nbtstat -t 10.1.1.7
正确答案: C

2: 单选题
All the workstations at a company have a static IP address. A newly deployed workstation is unable to connect to the company intranet server using an Internet browser. The technician can ping the intranet servers IP address. The MOST likely cause of this is an incorrect:
A.VLAN.
B.IP address on the new workstation.
C.DNS server setting on the client.
D.gateway setting on the client.
正确答案: C

3: 单选题
A 100 pair cable is typically used to connect:
A.telephony distribution.
B.businesses with more than 75 computers.
C.security cameras.
D.computer labs with more than 20 computers.
正确答案: A

4: 单选题
Which of the following software types would BEST be used at identifying and reacting to an attack by shutting down a port or dropping certain types of packets?
A.IDS
B.Packet sniffer
C.IPS
D.Port scanner
正确答案: C

5: 单选题
Which of the following features of a switch will allow two switches to pass network information?
A.Trunking
B.Disabling the routing protocols
C.Port speeds
D.PoE
正确答案: A

http://www.test4actual.com/jk0-016.html

6: 单选题
Which of the following network protocols allows for automated alerts and reports on network devices?
A.SNMP
B.IGMP
C.SMTP
D.TLS
正确答案: A

7: 单选题
Which of the following networks has the LEAST likelihood of collisions?
A.Mesh
B.Ring
C.Star
D.Bus
正确答案: B

8: 单选题
Ensuring that data is transmitted securely over an IP network is the main purpose of:
A.Telnet.
B.FTP.
C.SIP.
D.TLS.
正确答案: D

9: 单选题
Convert the following binary string to its dotted decimal address: 11000000.10101000.01100011.00011010
A.192.168.99.26
B.192.168.101.26
C.192.168.101.34
D.192.168.99.34
正确答案: A

10: 单选题
Which of the following network services is responsible for mapping names to IP addresses?
A.DHCP
B.DNS
C.IMAP4
D.Telnet
正确答案: B

http://www.test4actual.com
http://www.test4actual.com/jk0-016.html
http://www.test580.com

Exam : Microsoft Business Solutions MB6-511

Thursday, November 5th, 2009

Some Microsoft Business Solutions MB6-511 exam practice updated by Test4actual may help you pass your exams.

1.
When using ‘Job scheduling’, what planning principle is available, that is NOT available with
Operation scheduling?
A.Planning with queue times
B.Planning on task groups
C.Planning with resource efficiency percent
D.Planning with transportation times
Correct:B
2.When calculating a sales price for a BOM from a sales order line, where is the profitsetting
selected?
A.In the Inventory management parameters
B.On the BOM lines
C.In the BOM report as finished journal
D.In the BOM calculation
Correct:D
3.When substituting an item in a BOM on a started production order, it is necessary for the
production planner to delete the material consumption from one of the BOM lines. Material
consumption is reported and posted on the production order. What should be done to properly
record the actual material consumption?
A.Set the status back to Created and delete the production order.
B.Issue the additional material consumptions.
C.Set the status back to Cost estimated.
D.Create a new production picking list journal and create two lines one to decrease, and the other to enter
consumption on the new item.
Correct:D
4.Which of the following does NOT represent a stage or step in the Production Life Cycle in
Microsoft Dynamics AX?
A.Report as finished
B.Create
C.Start
D.Version control
Correct:D
5.What occurs if a production order is released and it has not been estimated or scheduled?
A.Those steps are skipped.
B.The estimation and scheduling steps are performed automatically.
C.The status is reset to ‘Started.’
D.An error message is displayed and the estimation and scheduling steps must be done manually.
Correct:B

http://www.test4actual.com

6.Without selecting “accept error,” when can a production order be reported as finished?
A.When reporting on the last operation from a route or job card journal.
B.When reporting on any operation from a route or job card journal.
C.When reporting on the first job on the work center.
D.When releasing the production.
Correct:A
Test4actual Information Co., Ltd.All rights reserved.
3
7.
Which of the following kinds of information are set up requirements in other modules, before the
Production module can be used? Choose the 2 that apply.
A.Company information
B.Items
C.Journal names
D.Routes
Correct:A B
8.A company has limited capacity on its’ machines, but the capacity of the operators is unlimited
(already set on the work center). The team manager wants to plan on the machinery and see the
required staff hours in the production plan. What setup BEST meets the managers requirements?
A.The route is set up with two operations with different operation numbers, one to control the operator and
one to control the machinery. Schedule with finite capacity.
B.The Route is set up with two operations with the same operation number, one to control the operator
and one to control the machinery. Schedule with finite capacity.
C.The route is set up with the use of priority on operations, and scheduling is done with infinite capacity.
D.The route is set up with the use of priority on operations. The scheduling is done with infinite capacity,
and the task group is created on the operators resource.
Correct:B
9.Which of the following is the most accurate way to describe the work center structure in
Microsoft Dynamics AX?
A.The companys work centers are divided into two levels, with the higher level being routing groups and
the lower level being cost categories.
B.They are defined hierarchically, with an unlimited number of levels.
C.The companys work centers are divided into two levels consisting of work center groups and work
centers.
D.The work center definitions in Microsoft Dynamics AX are composed of three tiers, work center groups,
work centers and subcontractor
work centers.
Correct:C
10.Which of the following are possible job types in the routing group? Choose the 2 that apply.
A.Queue before
B.Phantom
C.Setup
D.Subcontractor
Correct:C D

the latest updates:Microsoft Business Solutions MB6-509

Thursday, November 5th, 2009

Hi,guys.
Test4actual has updated the latest Microsoft Business Solutions MB6-509 exam,maybe it will help you pass your exams.
The newest practice for you:http://exam.test4actual.com/MB6-509.pdf

http://www.blog.test4actual.com

Are you worried about Microsoft Business Solutions MB6-504 exam?

Wednesday, November 4th, 2009

I have passed the Microsoft Business Solutions MB6-504 exam recently,if you are worried about it,maybe I can share some experience with you.A colleague of mine, who have got the Microsoft Business Solutions, recommend Test4actual to me, saying that without the help of test4actual, he couldn’t have passed the exam.
Any doubts about the products quality left? Try the Test4actual Microsoft Business Solutions MB6-504 exam free demo before buy!

1.
What is the purpose of the Employee/category validation setup?
A.To apply validation rules on categories for purchase requisition issued from the employee
B.To prevent an employee from reporting on nonauthorized
categories on a given project
C.To suggest or control what categories employees may use in project journals
D.To specify the categories where revenue can be accrued when you run the Post revenue script
Correct:C
2.The item CL100B
is frequently consumed in projects you set up. On which of the following can
project category be set up when CL100B
is sold or purchased from Project?
A.On the item group
B.On the item
C.In the Project parameters
D.On the setup tab in the Projects form
Correct:B
3.On a time and material project, the hotel expenses are to be invoiced directly to the customer.
However, the travel agency that books the hotel has a standard charge of 3% for administering all
travel arrangements. This extra fee should also be invoiced to the customer. Which of the
following will guarantee that this happens for every hotel transaction?
A.Specify a sales percentage on the line property for the transaction
B.In the expense journal, add a new category called ‘Extra’ and apply the amount
C.On the hotel category, set the sales price method to misc. percentage and 3%
D.Before invoicing add a total misc. charge to the invoice
Correct:C
4.You have finished a project, and are about to start a new one. The last project was very
successful, and you decide to work with the same team of employees on the new project. What
are the three ways of setting up the validation rules to apply to the new project?
A.Locate the individual employees in the Employee table and link them to the new project.
B.Copy the old project by using the Copy wizard and include the employee/project validation setup in the
new project
C.Create a new validation group where you link the employees to the new project
D.Select the Validation employees check box on the Setup tab of the new project
Correct:A B C
5.Cost Templates are used in which of the following projects?
A.Summary projects
B.Time and material projects
C.Fixedprice
projects
D.Internal projects
Correct:C

http://www.test4actual.com

6.Which of the following describes when the use of project periods is mandatory?
A.When estimating the capacities of employees
B.In connection with the project estimate function on fixed price projects
C.When they are used as delimiters in the statistics
D.When transferring transactions to General ledger
Correct:B
Test4actual Information Co., Ltd.All rights reserved.
3
7.
All employees working on a fixedprice
project need to enter their hour consumption. This also
includes possible overtime. How can you configure the system to make sure that overtime
payment is calculated for the employees?
A.They must enter an hour category with a sales price model set to misc. charges amount.
B.They double up their default hour cost specified in the hour journal.
C.The employees’ manager must use the adjustment functionality to change the cost price.
D.They change the line property on the overtime hours to one which has a cost percentage set up.
Correct:D
8.Which of the following is an advantage of using category groups?
A.They make it possible to connect employees to several categories in one action
B.They make it possible to define the posting rule on the group
C.They help define cost and sales prices for similar categories
D.They help define alternative approval procedures for groups and categories
Correct:B
9.The Project manager wants to track travel expenses and who is generating them on all projects.
How should the system be configured to achieve this?
A.By setting the Employee option on the travel category to Mandatory.
B.By setting up a validation rule that only employees can enter travel costs.
C.By setting up a journal approval step that prohibits posting if the employee ID has not been specified.
D.By setting up a specific cost journal for the employee exclusively for travel expenses.
Correct:A
10.Which of the following is a purpose of sorting fields?
A.To sort the parentchild
structure
B.To group certain projects
C.To divide fixedprice
projects and invoice projects
D.To determine whether transactions can be invoiced
Correct:B

Exam : Microsoft Business Solutions MB6-507

Wednesday, November 4th, 2009

Test4actual has updated the latest Microsoft Business Solutions MB6-507 exam,maybe it will help you pass your exams.
1.
A controller would like to assign a department 60Purchase
and cost center 6010Purchase
when
the accounts payable administrator creates vendor journals. Which of the following needs to be
defined to restrict the available selections?
A.Dimension proposal
B.Dimension planning
C.It can not be done
D.Dimension set hierarchy
Correct:D
2.One of the companies you are consolidating does business in a currency that has been
fluctuating a lot. However, when you run your consolidation, you want to only use a closing rate
for that period of the Monetary accounts. How would you set this up?
A.Set up a default exchange rate in the General Ledger parameters on the Consolidation tab.
B.Enter an exchange rate with no date on the exchange rate tab of the currency.
C.Enter an amount in the Monetary field on the currency and check the Monetary checkbox on the ledger
account.
D.This can not be done.
Correct:C
3.A controller is having issues with the monthly reports that have accounting entries made to the
wrong departments. The controller would like to ensure that the accounting entries are entered
with the correct department. Which of the following describes how to accomplish this in Dynamics
AX?
A.Update the general ledger parameters based on the controllers requirements.
B.Create a journal control record for the journal names being used in the general journal.
C.Create new dimension sets, hierarchies and rules based on the controllers requirements.
D.Create an accounts payable invoice approval journal and have the controller review the departments.
Correct:C
4.Which of the following happens to the transactions if you delete a period in which transactions
are posted?
A.All transactions in the deleted period disappear.
B.All transactions in the period are accumulated into one.
C.Nothing.
D.You are not allowed to delete a period in Dynamics AX.
Correct:C
5.The currency rate is changed on the 1st of every month. On the 1st of March, the rate is changed
from 390 to 400. On the 4th of March, an invoice with a date of February 28th is made. Which
exchange rate does the system use?
A.390
B.400
C.395 (the average of the two rates)
D.The exchange rate must be specified manually.
Correct:A

http://www.test4actual.com

6.You have several departments set up and need to run a financial statement for each one. How do
you run them?
Test4actual Information Co., Ltd.All rights reserved.
3
A.
The only way would be to create a financial statement for each department and run them separately.
B.Go to General Ledger, Reports, Transactions, Periodic, Financial statement under the dimension
specifications click the Line checkbox when running the statements.
C.Go to General Ledger, Reports, Transactions, Periodic, Financial statement, under the focuses and
change Main or Secondary focus when running the statements.
D.Go to General Ledger, Reports, Transactions, Periodic, Financial statement, click the Select button
when running the statements and leave the criteria field blank to get all departments.
Correct:C
7.Which of the following is the result of selecting the checkbox Locked in Journal under the
General tab of the Chart of Accounts?
A.It would close an account in the journal and transfer balances to the electronic closing sheet.
B.It prevents posting on all accounts in the journal.
C.It only allows new debit transactions to be posted.
D.It prevents posting on an account in the journal.
Correct:D
8.Your company wants to generate a number of sequentially numbered checks in the bank module.
Which of the following is a requirement to allow sequentially numbered checks?
A.Set up a number sequence on the check layout.
B.Select Automatic check numbering in the Parameters.
C.Create a Check group and define the number sequence.
D.Select Fixed in the check numbering method.
Correct:D
9.At what stage can a check number be deleted from the Bank module?
A.When the check status is Cancelled.
B.When the check status is Created.
C.At any stage in the payment process.
D.When the check status is Void.
Correct:B
10.Given the following information, which of the following happens when Invoice 1 is settled?
Date Text Company Currency USD 01 Dec. Invoice 1 100 120 31 Dec. Unreal. exch. profit. 20 0 20
Jan. Payment 1005 120
A.A realized exchange loss adjustment of 15 is posted.
B.Invoice 1 is settled 100% and the Customer has a balance of 15.
C.Unrealized exchange adjustment of 20 is reversed and a realized exchange adjustment of 5 is posted.
D.Unrealized exchange adjustment of 20 is reversed with 15 and no realized exchange adjustment is
posted.
Correct:C

Designing Microsoft Business Solutions

Tuesday, November 3rd, 2009

Microsoft Business Solutions “, also known as MB6-502 exam, is a Microsoft certification.
Preparing for the MB6-502 exam? Searching MB6-502 Test Questions, MB6-502 Practice Exam, MB6-502 Dumps?

1.
What is the purpose of the User profiles you create in the Product Builder module?
A.to set up commission calculating for each user
B.to specify which Microsoft Dynamics AX modules are available for each user
C.to control which parts of the Product Builder module each user group should have access to
D.to customize the Product Builder configuration form for the needs of specific user groups
Correct:D
2.In the Default values form, you can create contextsensitive
default values for your modeling
variables. What kinds of combinations can you make?
A.item and customer combinations
B.product model and item combinations
C.product model and customer combinations
D.product model, item, and customer combinations
Correct:A
3.What is the purpose of creating global rules?
A.You can be use them as templates when creating rules for the model.
B.They are available for all the users, irrespective of user profiles.
C.They are automatically applied to all the models you create.
D.You can attach them to several product models.
Correct:D
4.Emil is a Product Designer responsible for creating product models. There are plans to open a
subsidiary in Spain. Thus, it is necessary to translate the Product Builder configuration forms into
Spanish. How can he make the Product Builder configuration forms available in Spanish?
A.Select Spanish in the Product Builder parameters form.
B.Specify the translation in the form that opens after clicking Language texts in the Modeling variables
form.
C.Type the translation in the Translation table under Product Builder Setup.
D.Type the translation in the form that opens after clicking Language texts in the Variable group form.
Correct:B D
5.Emil is a Product Designer responsible for creating product models. He is given a task to create
a model for a configurable lamp. Emil wants to divide lamp characteristics specified by the user
into two groups and display them on two different tabs in the Product Builder configuration form.
One tab should be called Technical characteristics and another Design. How does he make these
names appear as tab names in the Product Builder configuration form?
A.Types them in the Variable group field of the Variable group form.
B.Types them in the Description field of the Modeling variables form.
C.Types them in the Description field of the Variable group form.
D.Clicks Test model and type them on the tabs of the form that appears.
Correct:C

http://www.test4actual.com

6.Emil is a Product Designer responsible for creating product models. His company has a new
lamp for sale. This item is to be made configurable, and Emil is given a task of creating a product
model for it. The lamp has the following characteristics: Color: Green, Yellow, Brown Height: 30.5,
45.5, 50.5 Number of bulbs: 1, 2, 3 Variables of which type does Emil use to make each
characteristic available in the Product Builder configuration form?
Test4actual Information Co., Ltd.All rights reserved.
3
A.
Enumerated text variable for the first, second, and third characteristics
B.Enumerated text variables for the first characteristic, Integer for the second, and Real for the third
C.Enumerated text variables for the first characteristic, Real for the second, and Integer for the third
D.Enumerated text variables for the first and third characteristic, and Real for the second
Correct:A
7.Emil is a Product Designer who maintains product models in a lighting equipment producing
company. He is responsible for lamp and shade models. His company has problems with
suppliers. Yellow plastic that is used in lamp production is no longer available. Emil is asked to
remove the yellow plastic from the list of choices available in the Product Builder configuration
form. How does he achieve this, provided that there are two modeling variables in the model:
Color and Material?
A.He creates a Constraint validation rule.
B.He creates an IF node.
C.He clears the Include check box for appropriate outcomes of Color and Material.
D.He sets the Field properties for Yellow and Plastic to Hide.
Correct:A
8.Emil is a Product Designer responsible for creating and maintaining lamp product models. When
ordering a reading lamp, all the customers usually order a red lamp together with a red shade.
Emil is asked by the Sales department to make Red appear by default as a shade color after the
user selects ‘Red’ as a lamp color. How can he implement this?
A.This task is impossible to perform in the Product Builder module.
B.Assign the Shade color variable a Red default value in the Default values form. You must make this
value valid for a single item and all customers.
C.Assign the Shade color variable a Red default value in the Default field of the Product model form.
Create a condition to make it appear only if ‘Red’ is selected for the lamp color.
D.Create an Action validation rule to make Red appear by default as a shade color in case ‘Red’ is
selected for the lamp color.
Correct:D
9.Susan is an Order Processor in a company that sells lighting equipment. The quartz lamp and
the daylight lamp are in popular demand. The requirements to the height of these lamps are the
same. Susan decides to create one item product model group and to attach configurable items
with the same height to it. How can she link the items to the item product model group?
A.In the form that opens after clicking Grouping in the Product model form, group configurable items
according to product model groups.
B.In the Item product model groups form, select which items must be included into the group.
C.In the Items form, specify the group to which the item must belong. Set this up for each item that must
be a part of the group.
D.In the Product Builder parameters form, set up which product model group is to be used for configurable
items.
Correct:C
10.Emil is a Product Designer responsible for creating product models. He creates a new product
model. When testing the model, he is not satisfied with the functioning of its validation rules and
group hierarchy. Emil wants to make improvements to the models rules and variable groups. How
Test4actual Information Co., Ltd.All rights reserved.
4
can
he return to editing the model?
A.Click Back to configuration to edit the model.
B.Return to the Product model form.
C.Edit the Product Builder configuration form in the form in which you test the model. Other model
elements can be changed in the Product model form.
D.Use the Product Model Wizard. After the model testing, it is the only tool used for editing it.